I-75 NB over SLIGH AVE & RAMP D-1

0.2MI NORTH OF I-4 · County 057, Florida · Built 1984 · 3 Lanes · 78,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100398
Year Built
1984
Reconstructed
2004
Length
107.8 m (353.7 ft)
Max Span
32.2 m
Width
23.1 m (75.8 ft)
Lanes
3
Daily Traffic
78,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.