I-75 NB (SR-93A) over US-92 (SR-600)

0.4MI SOUTH OF I-4(SR400) · County 057, Florida · Built 1983 · 3 Lanes · 83,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100415
Year Built
1983
Length
57.7 m (189.3 ft)
Max Span
32.3 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
83,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.