CR-886EB TO I-75NB over CANAL

At Golden Gate Pkwy · County 021, Florida · Built 2006 · 1 Lanes · 12,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
030312
Year Built
2006
Length
69.4 m (227.7 ft)
Max Span
26.8 m
Width
11.6 m (38.1 ft)
Lanes
1
Daily Traffic
12,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.