I-75NB TO CR-886 over CANAL

At Golden Gate Pkwy · County 021, Florida · Built 2006 · 1 Lanes · 2,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
030311
Year Built
2006
Length
154.2 m (505.9 ft)
Max Span
33.5 m
Width
13.1 m (43 ft)
Lanes
1
Daily Traffic
2,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.