CR886(GLDN GT PKY) over I-75 AND CANAL C-1

3.4MI WEST OF SR-951 · County 021, Florida · Built 1984 · 7 Lanes · 52,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
030199
Year Built
1984
Reconstructed
2006
Length
179.2 m (587.9 ft)
Max Span
33.2 m
Width
41.2 m (135.2 ft)
Lanes
7
Daily Traffic
52,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.