E STREET NW over CENTER LEG INNER LOOP
E ST. NW OVER INNER LOOP · County 001, District of Columbia · Built 1967 · 4 Lanes · 7,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.896136, -77.013811
This bridge is in worse condition than 77% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 59 years old.
Nearby Bridges
F Street NW over I-395
Built 2020
D STREET N.W. over CENTER LEG INNER LOOP
Built 1967
G Street NW over I-395
Built 2020
MASSACHUSETTS AVE over CENTER LEG INNERLOOP I39
Built 1968
H Street & Mas over CENTER LEG INNER LOOP
Built 1968
K Street over I-395
Built 1971
H STREET over WASHINGTON TERMINAL YARD
Built 1907
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
RAMP 1 over SB EXIT RMP 3 TO SB I-95
Built 1972
Bridge Details
- Structure #
- 1139
- Year Built
- 1967
- Reconstructed
- 2004
- Length
- 52.9 m (173.6 ft)
- Max Span
- 27.4 m
- Width
- 30 m (98.4 ft)
- Lanes
- 4
- Daily Traffic
- 7,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $1,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.