H Street & Mas over CENTER LEG INNER LOOP

HST OVER INNERLOOP I-395 · County 001, District of Columbia · Built 1968 · 3 Lanes · 24,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1140
Year Built
1968
Reconstructed
2013
Length
50.3 m (165 ft)
Max Span
24.7 m
Width
58.7 m (192.6 ft)
Lanes
3
Daily Traffic
24,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.