DAVIS AVENUE #2 over INDIAN HARBOR

.5 MI S OF EXIT 4 I-95NB · County 001, Connecticut · Built 2022 · 2 Lanes · 7,215 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
05012
Year Built
2022
Length
14.4 m (47.2 ft)
Max Span
13.5 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
7,215
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.