INTERSTATE-95 over HORSENECK CREEK

NEAR EXIT 3 · County 001, Connecticut · Built 1958 · 8 Lanes · 101,800 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
00008
Year Built
1958
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
8
Daily Traffic
101,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.