INTERSTATE-95 over FIELD POINT ROAD

0.3 MI EAST OF EXT 3 · County 001, Connecticut · Built 1958 · 6 Lanes · 109,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00006
Year Built
1958
Reconstructed
1985
Length
19.8 m (65 ft)
Max Span
18.2 m
Width
39 m (128 ft)
Lanes
6
Daily Traffic
109,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.