INTERSTATE-95 over SHORE ROAD # 1

WEST OF EXIT 3 · County 001, Connecticut · Built 1958 · 8 Lanes · 109,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00007
Year Built
1958
Reconstructed
1993
Length
21.1 m (69.2 ft)
Max Span
20 m
Width
44.9 m (147.3 ft)
Lanes
8
Daily Traffic
109,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.