INTERSTATE 95 over ARCH STREET

ROUTE I 95 EXIT 3 · County 003, Connecticut · Built 1958 · 6 Lanes · 101,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00009
Year Built
1958
Length
21.5 m (70.5 ft)
Max Span
20 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
101,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.