ROUTE 130 over YELLOW MILL POND

NEAR EXIT 29 I-95 · County 001, Connecticut · Built 1926 · 4 Lanes · 13,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
03637
Year Built
1926
Reconstructed
1998
Length
103.6 m (339.9 ft)
Max Span
37.2 m
Width
24.9 m (81.7 ft)
Lanes
4
Daily Traffic
13,600
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.