I-95 RAMP 097 over RT 130&YELLOW MILL POND

I-95 NB EXIT 29 OFF RAMP · County 001, Connecticut · Built 1999 · 1 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00115B
Year Built
1999
Length
104.5 m (342.8 ft)
Max Span
36.3 m
Width
10.2 m (33.5 ft)
Lanes
1
Daily Traffic
6,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A