I-95 SB RAMP 355 over ROUTE 130 EB

I-95 SOUTHBOUND EXIT 29 · County 001, Connecticut · Built 1999 · 1 Lanes · 5,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00117
Year Built
1999
Length
36.6 m (120.1 ft)
Max Span
35.4 m
Width
10.8 m (35.4 ft)
Lanes
1
Daily Traffic
5,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.