INTERSTATE 95 over YELLOW MILL POND&RTE 130

INTERSTATE 95 EXIT 29 · County 001, Connecticut · Built 1958 · 6 Lanes · 117,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00115A
Year Built
1958
Reconstructed
1999
Length
396.7 m (1301.5 ft)
Max Span
84.1 m
Width
43.1 m (141.4 ft)
Lanes
6
Daily Traffic
117,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.