I-84 RAMP 199 over MEADOW ST & MNRR ROADWAY

BANK ST TO I-84 WB · County 009, Connecticut · Built 1965 · 1 Lanes · 1,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
03191G
Year Built
1965
Length
69.5 m (228 ft)
Max Span
25 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
1,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.