I-84 RAMP 197 over RAMP 202 MEADOW STREET
EXIT 21 I-84 EB RAMP · County 009, Connecticut · Built 1967 · 1 Lanes · 2,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.551908, -73.045039
This bridge is in worse condition than 96.4% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 59 years old.
Nearby Bridges
I-84 RAMP 199 over MEADOW ST & MNRR ROADWAY
Built 1965
I-84 RAMP 200 over I-84 RAMPS 199&202 BANK
Built 1966
I-84 RAMP 201 over I-84 RAMP 198 & BANK ST
Built 1965
I-84 RAMP 198 over NO NOTABLE FEATURE
Built 1967
I-84 RAMP 202 over BANK STREET
Built 1965
INTERSTATE 84 WB over BANK STREET & RAMP 199
Built 1965
ROUTE 8 RAMP 128 over RIVERSIDE STREET SB
Built 1966
ROUTE 8 SB over RIVERSIDE STREET SB
Built 1965
ROUTE 8 SOUTHBOUND over RIVERSIDE ST-SUNNYSIDE
Built 1966
I-84 TR 812 over RIVERSIDE ST NAUGATUCK R
Built 1966
Bridge Details
- Structure #
- 03191F
- Year Built
- 1967
- Reconstructed
- 1990
- Length
- 204.8 m (671.9 ft)
- Max Span
- 25.9 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 2,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.