ROUTE 8 RAMP 128 over RIVERSIDE STREET SB
EXIT 32 ROUTE 8 NB · County 009, Connecticut · Built 1966 · 1 Lanes · 2,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.549803, -73.047708
This bridge is in worse condition than 36.3% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 60 years old.
Nearby Bridges
ROUTE 8 SB over RIVERSIDE STREET SB
Built 1965
ROUTE 8 SOUTHBOUND over RIVERSIDE ST-SUNNYSIDE
Built 1966
I-84 TR 811 over I-84 TR 812 & NAUGATUCK
Built 1966
I-84 TR 812 over RIVERSIDE ST NAUGATUCK R
Built 1966
I-84 RAMP 198 over NO NOTABLE FEATURE
Built 1967
I-84 RAMP 200 over I-84 RAMPS 199&202 BANK
Built 1966
I-84 RAMP 201 over I-84 RAMP 198 & BANK ST
Built 1965
I-84 RAMP 197 over RAMP 202 MEADOW STREET
Built 1967
I-84 RAMP 199 over MEADOW ST & MNRR ROADWAY
Built 1965
I-84 TR 810 over ROUTE 8 NB & RAMP 128
Built 1967
Bridge Details
- Structure #
- 03190E
- Year Built
- 1966
- Reconstructed
- 1990
- Length
- 150.9 m (495.1 ft)
- Max Span
- 21.9 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 2,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $11,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.