ROUTE 8 SOUTHBOUND over RIVERSIDE ST-SUNNYSIDE

ROUTE 8 SOUTH OF I-84 · County 009, Connecticut · Built 1966 · 2 Lanes · 16,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
03190B
Year Built
1966
Reconstructed
1991
Length
484.3 m (1588.9 ft)
Max Span
35.4 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
16,900
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$11,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.