ROUTE 2 over I-91 & CONN RV CT SO. RR

JCT ROUTE 2 & I-91 · County 003, Connecticut · Built 1958 · 7 Lanes · 28,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00371A
Year Built
1958
Reconstructed
1999
Length
358.1 m (1174.9 ft)
Max Span
51.2 m
Width
34.1 m (111.9 ft)
Lanes
7
Daily Traffic
28,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.