US ROUTE 44 WB over I-91 NB C-D RDWY & RAMP

AT WEST END BULKELEY BRG · County 003, Connecticut · Built 1960 · 2 Lanes · 8,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06048
Year Built
1960
Reconstructed
1989
Length
46.9 m (153.9 ft)
Max Span
17.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
8,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.