I-84 TR 826 over CONNECTICUT RIVER

EXIT 51 I-84 WB TO I-91NB · County 003, Connecticut · Built 1964 · 1 Lanes · 14,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00980B
Year Built
1964
Reconstructed
2020
Length
80.2 m (263.1 ft)
Max Span
37.5 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
14,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.