INTERSTATE-91 SB over RAMP D&F I-84 US RTE 44

0.16 MILE NORTH OF RTE 2 · County 003, Connecticut · Built 1961 · 2 Lanes · 49,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01428A
Year Built
1961
Reconstructed
1991
Length
289.9 m (951.1 ft)
Max Span
24.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
49,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.