INTERSTATE-95 over COMPO ROAD SOUTH

BETWEEN EXIT 17 AND 18 · County 001, Connecticut · Built 1957 · 6 Lanes · 110,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00065
Year Built
1957
Reconstructed
1996
Length
28.3 m (92.8 ft)
Max Span
26.8 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
110,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.