INTERSTATE-95 over ROUTE 136 & SAUGATUCK

BETWEEN EXIT 17 & 18 I-95 · County 001, Connecticut · Built 1958 · 6 Lanes · 110,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00064
Year Built
1958
Reconstructed
1994
Length
370.3 m (1214.9 ft)
Max Span
39.3 m
Width
36.3 m (119.1 ft)
Lanes
6
Daily Traffic
110,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$10,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.