HILLS POINT ROAD over INTERSTATE-95

1.3 MI N. OF ROUTE 136 · County 001, Connecticut · Built 1958 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00067
Year Built
1958
Length
56.1 m (184.1 ft)
Max Span
27.4 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
3,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.