SSR 476 over MILL CREEK

I-95 SB EXIT 18 · County 001, Connecticut · Built 1958 · 4 Lanes · 1,400 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
01612
Year Built
1958
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
1,400
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.