INTERSTATE-95 over ROUTE 33

I-95 AT EXIT 17 · County 001, Connecticut · Built 2023 · 8 Lanes · 124,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00062
Year Built
2023
Length
27.2 m (89.2 ft)
Max Span
25.9 m
Width
45.9 m (150.6 ft)
Lanes
8
Daily Traffic
124,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$10,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.