CENTERRA PKWY over Future Bike Trail
1.2 MI N OF KENDALL ST · County 069, Colorado · Built 2007 · 4 Lanes · 9,904 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.421219, -104.984386
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 19 years old.
Nearby Bridges
I25/CNTR LOAD BUS over PEDESTRIAN UNDERPASS
Built 2021
I-25 ML NBND over UPRR/FUTURE KENDALL PWY
Built 2022
I-25 ML SBND over UPRR/FUTURE KENDALL PWY
Built 2020
I 25 ML NB+SB+SR over GREELEY-LOVELAND DITCH
Built 1947
Sky Pond Drive over Greeley Loveland Canal
Built 2005
Centerra Parkway over Greeley Loveland Canal
Built 2005
Rocky Mountain Ave over Greeley Loveland Canal
Built 2000
US 34 ML over I 25 ML
Built 2022
I 25 ML NBND over CROSSROADS BLVD.
Built 2017
I 25 ML SBND over CROSSROADS BLVD.
Built 2017
Bridge Details
- Structure #
- LOV2888CENTERRA
- Year Built
- 2007
- Length
- 7.2 m (23.6 ft)
- Max Span
- 7.2 m
- Width
- 45.1 m (148 ft)
- Lanes
- 4
- Daily Traffic
- 9,904
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.