US 34 ML over I 25 ML
I-25 LOVELAND INTERCH. · County 069, Colorado · Built 2022 · 8 Lanes · 19,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.407175, -104.993572
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
Sky Pond Drive over Greeley Loveland Canal
Built 2005
Rocky Mtn. Avenue over Farmers Independent Ditc
Built 1994
COUNTY ROAD 20E over I 25 ML
Built 2021
Centerra Parkway over Greeley Loveland Canal
Built 2005
I 25 ML NB+SB+SR over GREELEY-LOVELAND DITCH
Built 1947
Rocky Mountain Ave over Greeley Loveland Canal
Built 2000
I 25 SERVICE RD over BIG THOMPSON RIVER SR
Built 2020
I 25 ML NBND over BIG THOMPSON RIVER
Built 2021
I 25 ML SBND over BIG THOMPSON RIVER
Built 2022
Fall River Drive over Farmers Indepen. Ditch
Built 1998
Bridge Details
- Structure #
- C-17-EM
- Year Built
- 2022
- Length
- 67.1 m (220.1 ft)
- Max Span
- 32.1 m
- Width
- 38.6 m (126.6 ft)
- Lanes
- 8
- Daily Traffic
- 19,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $394,000
- Total Project Cost
- $591,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.