I 25 ML NBND over BIG THOMPSON RIVER
1.3 MI N OF JCT SH 402 · County 069, Colorado · Built 2021 · 4 Lanes · 34,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.397014, -104.993131
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 5 years old.
Nearby Bridges
I 25 SERVICE RD over BIG THOMPSON RIVER SR
Built 2020
I 25 ML SBND over BIG THOMPSON RIVER
Built 2022
COUNTY ROAD 20E over I 25 ML
Built 2021
US 34 ML over I 25 ML
Built 2022
Rocky Mtn. Avenue over Farmers Independent Ditc
Built 1994
Centerra Parkway over Greeley Loveland Canal
Built 2005
Sky Pond Drive over Greeley Loveland Canal
Built 2005
Fall River Drive over Farmers Indepen. Ditch
Built 1998
I 25 ML NB+SB+SR over GREELEY-LOVELAND DITCH
Built 1947
Rocky Mountain Ave over Greeley Loveland Canal
Built 2000
Bridge Details
- Structure #
- C-17-BMA
- Year Built
- 2021
- Length
- 86.3 m (283.1 ft)
- Max Span
- 28.3 m
- Width
- 24.1 m (79.1 ft)
- Lanes
- 4
- Daily Traffic
- 34,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.