I-25 ML NBND over UPRR/FUTURE KENDALL PWY

1.0 MI N OF US34 · County 069, Colorado · Built 2022 · 4 Lanes · 38,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
C-17-GK
Year Built
2022
Length
73.3 m (240.5 ft)
Max Span
42.4 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
38,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.