I25/CNTR LOAD BUS over PEDESTRIAN UNDERPASS

1.0 MI N OF JCT US 34 · County 069, Colorado · Built 2021 · 6 Lanes · 34,500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
C-17-EPA
Year Built
2021
Length
6.1 m (20 ft)
Max Span
6.1 m
Width
87.5 m (287.1 ft)
Lanes
6
Daily Traffic
34,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.