I 25 ML over RTD Pedestrian Underpass
Southmoor PNR · County 031, Colorado · Built 2003 · 10 Lanes · 261,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.648608, -104.915592
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 23 years old.
Nearby Bridges
US 285 ML over I 25 ML
Built 2006
US 285 Hampden Ave over LRT
Built 2005
QUINCY AVE. over I25 ML & LRT
Built 2004
SH 30 ML/HAMPDEN over GOLDSMITH GULCH
Built 1965
E EASTMAN AVENUE over GOLDSMITH GULCH
Built 1978
S ROSEMARY WAY over GOLDSMITH GULCH
Built 1985
I 25 ML over HIGHLINE CANAL
Built 1950
E CORNELL AVENUE over GOLDSMITH GULCH
Built 1971
SB I-25 Ramp over LRT
Built 2005
I25 ML over LRT
Built 2004
Bridge Details
- Structure #
- F-17-NW
- Year Built
- 2003
- Length
- 6.1 m (20 ft)
- Max Span
- 6.1 m
- Width
- 55.6 m (182.4 ft)
- Lanes
- 10
- Daily Traffic
- 261,000
- Material
- Concrete
- Design
- Culvert
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.