E EASTMAN AVENUE over GOLDSMITH GULCH

JUST W OF TAMARAC DR · County 031, Colorado · Built 1978 · 2 Lanes · 3,301 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
D-11-GG-130
Year Built
1978
Length
14.6 m (47.9 ft)
Max Span
3.8 m
Width
21.4 m (70.2 ft)
Lanes
2
Daily Traffic
3,301
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.