US 285 ML over I 25 ML
IN DENVER · County 031, Colorado · Built 2006 · 10 Lanes · 49,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.652886, -104.918875
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 20 years old.
Nearby Bridges
US 285 Hampden Ave over LRT
Built 2005
I 25 ML over RTD Pedestrian Underpass
Built 2003
I 25 ML over HIGHLINE CANAL
Built 1950
S DAHLIA ST over HIGHLINE CANAL
Built 1952
E EASTMAN AVENUE over GOLDSMITH GULCH
Built 1978
E CORNELL AVENUE over GOLDSMITH GULCH
Built 1971
SH 30 ML/HAMPDEN over GOLDSMITH GULCH
Built 1965
YALE AVE over HIGHLINE CANAL
Built 1955
I 25 ML over YALE AVE
Built 1998
QUINCY AVE. over I25 ML & LRT
Built 2004
Bridge Details
- Structure #
- F-17-OT
- Year Built
- 2006
- Length
- 48.9 m (160.4 ft)
- Max Span
- 24 m
- Width
- 46.9 m (153.9 ft)
- Lanes
- 10
- Daily Traffic
- 49,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,065,000
- Total Project Cost
- $1,598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.