I25 ML over LRT

LRT TO I225 LRT UNDER I25 · County 031, Colorado · Built 2004 · 9 Lanes · 223,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
F-17-PS
Year Built
2004
Length
16.3 m (53.5 ft)
Max Span
15.4 m
Width
67 m (219.8 ft)
Lanes
9
Daily Traffic
223,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.