NB I-25 RAMP over I225 ML
At I-25/I-225 · County 031, Colorado · Built 2005 · 2 Lanes · 111,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.630542, -104.905067
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 21 years old.
Nearby Bridges
SB I-25 Offramp over LRT
Built 2005
E UNION AVENUE WB over RTD TRACKS | BELLEVIEW A
Built 1992
E UNION AVE EB over RTD TRACKS | BELLEVIEW A
Built 1992
I 25 ML over I 225 LRT
Built 2004
NB 225 RAMP over I25 ML
Built 2005
I25 ML S over I225 RAMP
Built 2004
I25 ML over LRT
Built 2004
SB I-25 Ramp over LRT
Built 2005
I 225 ML NBND over ULSTER ST.
Built 1976
I 225 ML NBND+RAMP over ULSTER ST.
Built 1976
Bridge Details
- Structure #
- F-17-FJ
- Year Built
- 2005
- Length
- 145.1 m (476 ft)
- Max Span
- 50.3 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 111,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.