I25 ML S over I225 RAMP
225/25 TUNNEL · County 031, Colorado · Built 2004 · 9 Lanes · 221,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.634078, -104.905778
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 22 years old.
Nearby Bridges
NB 225 RAMP over I25 ML
Built 2005
I 25 ML over I 225 LRT
Built 2004
I25 ML over LRT
Built 2004
SB I-25 Ramp over LRT
Built 2005
SB I-25 Offramp over LRT
Built 2005
I 225 ML NBND+RAMP over ULSTER ST.
Built 1976
I 225 ML SBND over ULSTER ST.
Built 1976
I 225 ML NBND over ULSTER ST.
Built 1976
NB I-25 RAMP over I225 ML
Built 2005
E UNION AVENUE WB over RTD TRACKS | BELLEVIEW A
Built 1992
Bridge Details
- Structure #
- F-17-FW
- Year Built
- 2004
- Length
- 34 m (111.5 ft)
- Max Span
- 34 m
- Width
- 117.9 m (386.8 ft)
- Lanes
- 9
- Daily Traffic
- 221,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.