I 25 ML over 8TH AVE

IN DENVER · County 031, Colorado · Built 1958 · 12 Lanes · 228,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F-16-DX
Year Built
1958
Reconstructed
2001
Length
46.9 m (153.9 ft)
Max Span
22.9 m
Width
59.1 m (193.9 ft)
Lanes
12
Daily Traffic
228,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.