I 25 SBND RAMP over I 25 ML

JCT I25 + SH6 IN DENVER · County 031, Colorado · Built 1989 · 1 Lanes · 107,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-OL
Year Built
1989
Length
363.9 m (1193.9 ft)
Max Span
52.6 m
Width
10.4 m (34.1 ft)
Lanes
1
Daily Traffic
107,500
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.