US 6 ML over BNSF RR and US 6 RAMP

EAST EDGE OF I-25 INT. · County 031, Colorado · Built 2014 · 7 Lanes · 136,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-YJ
Year Built
2014
Length
59.9 m (196.5 ft)
Max Span
37.6 m
Width
41.8 m (137.1 ft)
Lanes
7
Daily Traffic
136,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.