RAMP TO I 25 NBND over INTERCHANGE ROW R

JCT I-25 AT 6TH AVE IN DE · County 031, Colorado · Built 1989 · 1 Lanes · 107,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-16-NO
Year Built
1989
Length
202.4 m (664 ft)
Max Span
45.5 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
107,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.