E-470 SB over Cottonwood Drive

5.76 MI FROM I25 · County 035, Colorado · Built 1996 · 3 Lanes · 25,742 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-05.76B
Year Built
1996
Reconstructed
2017
Length
40.4 m (132.5 ft)
Max Span
38.8 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
25,742
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.