TWENTY MILE ROAD over BALDWIN GULCH | BALDWIN
0.2 MI S OF PINE DRIVE · County 035, Colorado · Built 2005 · 5 Lanes · 11,352 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
39.542128, -104.775206
This bridge is in worse condition than 64.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 21 years old.
Nearby Bridges
PINE LANE over CHERRY CREEK | CHERRY CR
Built 2008
LINCOLN AVENUE WB over NEWLIN GULCH | NEWLIN GU
Built 2000
LINCOLN AVENUE EB over NEWLIN GULCH | NEWLIN GU
Built 1998
E-470 NB over Cherry Creek
Built 1996
Ramp A over Cherry Creek
Built 1990
E-470 SB over Cherry Creek
Built 1990
SH 83 ML over BALDWIN GULCH
Built 1982
LINCOLN AVENUE EB over CHERRY CREEK | CHERRY CR
Built 1998
LINCOLN AVENUE WB over CHERRY CREEK | COLORADO
Built 2000
E-470 EB over Parker Road
Built 1996
Bridge Details
- Structure #
- PAR TWENTY-0.15
- Year Built
- 2005
- Length
- 11.4 m (37.4 ft)
- Max Span
- 9.4 m
- Width
- 35 m (114.8 ft)
- Lanes
- 5
- Daily Traffic
- 11,352
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.