E-470 EB over Parker Road
5.25 MI FROM I25 · County 035, Colorado · Built 1996 · 4 Lanes · 24,375 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.551728, -104.77625
This bridge is in worse condition than 28.4% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 30 years old.
Nearby Bridges
E-470 WB over Parker Road
Built 1996
E-470 NB over Cherry Creek
Built 1996
Ramp A over Cherry Creek
Built 1990
E-470 SB over Cherry Creek
Built 1990
E-470 NB over Cottonwood Drive
Built 1996
E-470 SB over Cottonwood Drive
Built 1996
PINE LANE over CHERRY CREEK | CHERRY CR
Built 2008
WB COTTONWOOD DRIV over CHERRY CREEK | CHERRY CR
Built 1988
EB COTTONWOOD DRIV over CHERRY CREEK | CHERRY CR
Built 2021
TWENTY MILE ROAD over BALDWIN GULCH | BALDWIN
Built 2005
Bridge Details
- Structure #
- E-470-05.25A
- Year Built
- 1996
- Reconstructed
- 2016
- Length
- 81.6 m (267.7 ft)
- Max Span
- 41.3 m
- Width
- 25 m (82 ft)
- Lanes
- 4
- Daily Traffic
- 24,375
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.