E-470 WB over Parker Road

5.25 MI FROM I25 · County 035, Colorado · Built 1996 · 4 Lanes · 25,943 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-05.25B
Year Built
1996
Reconstructed
2016
Length
81.6 m (267.7 ft)
Max Span
42.5 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
25,943
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.