I 76 ML WBND over US 85 ML NBND

I76 & US 85C JCT · County 001, Colorado · Built 1990 · 2 Lanes · 16,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-OY
Year Built
1990
Length
69.3 m (227.4 ft)
Max Span
26.8 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.