EB SH 44_104TH AVE over I76 ML
NE of HWY 85 Junction · County 001, Colorado · Built 2015 · 2 Lanes · 9,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.885008, -104.869575
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 11 years old.
Nearby Bridges
SH 44 ML WBND over I 76 ML
Built 1996
HAVANA STREET over OBRIAN CANAL
Built 1984
BELLE CREEK BLVD over BELLE CREEK
Built 2003
SH 44 EB over OBRIAN CANAL
Built 2013
SH 44 WB over OBRIAN CANAL
Built 2013
I 76 ML WBND over UP RR
Built 2014
I 76 ML EBND over UP RR
Built 2016
I 76 ML WBND over US 85 ML NBND
Built 1990
96TH AVENUE over OBRIAN CANAL
Built 1994
112TH AVENUE over FULTON DITCH
Built 2021
Bridge Details
- Structure #
- E-17-AEG
- Year Built
- 2015
- Length
- 105.2 m (345.1 ft)
- Max Span
- 51.8 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.